We have executed various contracts for pressure vessels, columns, reactors, heat exchangers etc... |
| some important contract executed are mentoined below. |
|
 |
FCCU Reactor Weight 850 M.T
|
| |
End user: Foster Wheeler (Fowely) U.K |
 |
Poly Propylene Reactor Weight 450 M.T
|
| |
End User: PARSON-USA |
 |
Recycle Column Weight 735 M.T
|
| |
End User: SHEVRON NOUSINA-USA |
 |
Aromatic Columns
|
| |
End User: Reliance Industries Ltd |
 |
S.S Heat Exchangers 28 Nos.
|
| |
End User: Sidem, France |
 |
S.S. Evaporator Equipments – 2 Nos. 350 M.T each
|
| |
End User: Sidem, France |
 |
S.S. Evaporator Equipment – 1 No. 900 M.T each
|
| |
End User: Ras-Al-Khaima |
 |
Fabrication of Reel 40 M.T. each 05 Nos
|
| |
End User: flexible pipe technology well stream -U.K |
 |
Strator Frame & Turbine casing
|
| |
End User: GE, USA |
 |
Coke drum upto maximum 500 M.T |
 |
Product splitter 685 M.T.
|
| |
End User: NIC SAUDI ARABIA |
 |
|
| |
SAMSUNG SAUDI ARABIA |
 |
Surface Condenser Qty 2 Nos -550 Mt each
|
| |
TATA Mundra Project-2 nos |
 |
Direct Contact After Cooler-74 Mt
|
| |
Essar Vadinar Refinary |
 |
GTL Project Qty 18 Nos Top Dish End Coil forming and assembly and Hydro testing
|
 |
|
| |
Essar Vadinar Refinary |
 |
Scrubber – 2 Nos 82 M.T each
|
 |
SS Scrubber – 1 Nos 375 M.T
|
 |
|
 |
Piles (Tubuler Welding) 4 lots
|
| |
End User: O.N.G.C |
 |
Piles of 9WPP Project – carried out at Mangalore
|
| |
End User: O.N.G.C |
 |
NHA Deck Complete Aseembly 650 Mt
|
| |
End User: O.N.G.C |
 |
Vent Scrubber Vessel |
| |
End User: I.O.C.L |
 |
Structure for building module and helideck |
| |
End User: ONGC |
 |
Hot Oil Dump Vessel |
| |
End User: I.O.C.L |
 |
RS 16 Deck Complete Aseembly 1100 Mt |
| |
End User: O.N.G.C |
 |
Different Sections of Coal Gasifier 1000 Mt |
| |
End User: YT, ZYDH China |
 |
Site Joint and Aseembly of complete coal and Gasifier maximum 1300 M.T. (Total 6 nos. so far) and further 2 nos. are in progress. |
Above mentioned equipments were fabricated by us at L & T, Hazira,Essar Heavy Engineering Services, Reliance Industries, G. R. Engineering works tarapore, L & T China Site under their supervision and finally inspected by reputed third party inspection agencies such as Lloyds, TUV, BV, EIL, PDIL etc.
|