MAJOR CONTRACTS/ WORK HANDLED AT SITE

Below mentioned equipments were fabricated by us at L&T, Hazira under their supervision and finally inspected by reputed third party inspection agencies such as Lloyds, BV, EIL, PDIL etc.

  FCCU Reactor weight 850 M.T
  End user: Foster Wheeler (Fowely), U.K.

  Poly Propylene reactor weight 450 M.T
 
End user: PARSON, USA

  Recycle column weight 735 M.T
 End user: SHEVRON NOUSINA, USA

  Aromatic columns
  End user: Reliance Industries Ltd

  S.S Heat exchanger 28 nos.
 
End user: Sidem, France

  S.S Evaporator equipments – 2 nos. 350 M.T each
 
End user: Sidem, France

  S.S Evaporator equipments – 1 nos. 900 M.T each
 
  End user: Ras-Al-Khaima

  Fabrication of reel 40 M.T each 05 nos
 
End user: Flexible piping technology well stream, U.K.

  Strator Frame & Turbine casing
 
End user: GE, USA

  Product splitter 685 M.T 
 
End user: NIC, SAUDI ARABIA

  Catofin Reactor 350 M.T
 
End user: SAMSUNG, SAUDI ARABIA

  Scrubber – 2 nos 82 M.T each

  Reactor 41 M.T

  Piles (Tubular Welding) 4 lots
 
End user: O.N.G.C

  Vent scrubber vessel
 
End user: I.O.C.L

  Structure for building module and helideck
 
End user: O.N.G.C

  Hot oil dump vessel
 
End user: I.O.C.L

 

|| Home || About us || Infrastructure || Major Contracts|| Products ||  Clients || Enquiry || Contact Us ||

 © Copyright 2005-2006  Jeckson Engineers & Fabricators.  All Rights Reserved.  WEB MASTER :  E-Square Business Solution